講解濟南膩子粉的施工條件與調配方法
來源:http://m.sjzmx.cn 日期:2025-07-07 發布人:
濟南的氣候特點對膩子粉施工影響顯著,其施工條件的把控和調配方法的科學性,直接關系到墻面基層處理的質量。結合當地四季溫差大、夏季多雨、冬季干燥的氣候特征,需從環境要求、基層處理、材料調配等方面規范操作。
The climate characteristics of Jinan have a significant impact on the construction of putty powder, and the scientific control of construction conditions and mixing methods directly affect the quality of wall base treatment. Considering the climate characteristics of large temperature differences throughout the year, rainy summers, and dry winters in the local area, it is necessary to standardize operations in terms of environmental requirements, grassroots treatment, and material allocation.
一、施工條件的關鍵要素
1、 Key elements of construction conditions
1. 溫濕度控制
1. Temperature and humidity control
濟南春季多風干燥,夏季高溫多雨,施工時需將環境溫度控制在 5-35℃之間。溫度過低會導致膩子粉凝結緩慢,影響固化強度;高于 35℃則水分蒸發過快,易出現干裂。空氣相對濕度需保持在 40%-80%,梅雨季施工時可借助除濕機降低濕度,避免墻面返潮導致膩子層起泡;冬季干燥時,可在施工區域適當灑水增濕,但需確保墻面無明水。
Jinan is windy and dry in spring, and hot and rainy in summer. During construction, the ambient temperature should be controlled between 5-35 ℃. Low temperature can cause slow solidification of putty powder, affecting the curing strength; If the temperature is higher than 35 ℃, the water evaporates too quickly and is prone to drying and cracking. The relative humidity of the air should be maintained at 40% -80%. During construction in the rainy season, dehumidifiers can be used to reduce the humidity and avoid wall moisture from causing bubbles in the putty layer; When it is dry in winter, it is advisable to sprinkle water appropriately in the construction area to increase humidity, but it is necessary to ensure that there is no visible water on the wall.

2. 基層處理標準
2. Grassroots treatment standards
施工前墻面基層必須堅實平整,無浮灰、油污、空鼓等缺陷。先用鏟刀清除殘留的砂漿塊和疏松表層,再用細砂紙打磨至表面光滑。對于濟南老房常見的墻面返堿現象,需用草酸溶液擦拭中和,待干燥后再刷一遍界面劑,增強膩子與基層的附著力。墻面含水率需控制在 10% 以下,可通過含水率檢測儀檢測,潮濕區域需提前通風干燥 3-5 天。
Before construction, the wall base must be solid and flat, without defects such as floating ash, oil stains, hollowing, etc. First, use a scraper to remove any remaining mortar blocks and loose surface, and then polish with fine sandpaper until the surface is smooth. For the common phenomenon of wall alkali return in old houses in Jinan, oxalic acid solution should be used to wipe and neutralize it. After drying, the interface agent should be brushed again to enhance the adhesion between the putty and the base layer. The moisture content of the wall should be controlled below 10%, which can be detected by a moisture content detector. Wet areas should be ventilated and dried for 3-5 days in advance.
二、膩子粉的科學調配方法
2、 Scientific blending method of putty powder
1. 材料配比與攪拌技巧
1. Material ratio and mixing techniques
普通內墻膩子粉與水的配比通常為 1:0.3-0.4(重量比),具體需根據產品特性微調。調配時先將清水倒入干凈容器,再緩慢加入膩子粉,邊倒邊用電動攪拌器勻速攪拌,攪拌時間不少于 3 分鐘,確保形成均勻無顆粒的膏狀。靜置 5 分鐘后再次攪拌,可增強膩子的粘稠度和均勻性,避免因攪拌不勻導致墻面出現斑駁。
The ratio of ordinary interior wall putty powder to water is usually 1:0.3-0.4 (weight ratio), which needs to be adjusted according to product characteristics. When mixing, first pour clean water into a clean container, then slowly add putty powder. While pouring, use an electric mixer to stir at a constant speed for no less than 3 minutes to ensure the formation of a uniform and particle free paste. After standing still for 5 minutes, stir again to enhance the viscosity and uniformity of the putty, avoiding the appearance of mottled walls due to uneven mixing.
2. 特殊場景的調配調整
2. Adjustment and deployment for special scenarios
針對濟南外墻或潮濕環境(如廚房、衛生間附近墻面),可在調配時加入適量防水劑,比例約為膩子粉重量的 3%-5%,提升膩子層的抗滲性。對于需要增強附著力的新舊墻面交界處,可摻入 5%-8% 的白乳膠,攪拌均勻后使用,但需注意白乳膠的用量不宜過多,否則會導致膩子層過硬易開裂。
For exterior walls or damp environments in Jinan (such as walls near kitchens and bathrooms), an appropriate amount of waterproofing agent can be added during preparation, with a proportion of about 3% -5% of the weight of putty powder, to enhance the impermeability of the putty layer. For the junction of new and old walls that require enhanced adhesion, 5% -8% white latex can be added and mixed evenly before use. However, it should be noted that the amount of white latex should not be too much, otherwise it will cause the putty layer to become too hard and prone to cracking.
3. 施工過程的注意事項
3. Precautions during the construction process
調配好的膩子需在 2 小時內用完,避免因濟南干燥的空氣導致其凝固失效。施工時需分兩遍刮涂,第一遍厚度控制在 1-2 毫米,主要用于填補墻面縫隙和不平處,待完全干燥(夏季約 6-8 小時,冬季需 12-24 小時)后用砂紙打磨平整;第二遍厚度 0.5-1 毫米,追求表面光滑細膩。兩遍施工間隔需根據天氣調整,陰雨天可延長干燥時間,確保前一層完全固化。
The prepared putty should be used up within 2 hours to avoid solidification failure caused by the dry air in Jinan. During construction, it is necessary to scrape and apply in two layers. The thickness of the first layer should be controlled at 1-2 millimeters, mainly used to fill the gaps and unevenness of the wall. After it is completely dry (about 6-8 hours in summer and 12-24 hours in winter), it should be sanded flat with sandpaper; The second layer has a thickness of 0.5-1 millimeter, aiming for a smooth and delicate surface. The interval between two construction runs needs to be adjusted according to the weather, and the drying time can be extended on rainy days to ensure that the previous layer is completely cured.
本文由濟南膩子粉友情奉獻.更多有關的知識請點擊:http://m.sjzmx.cn真誠的態度.為您提供為全面的服務.更多有關的知識我們將會陸續向大家奉獻.敬請期待.
This article is a friendly contribution from Jinan gypsum powder For more information, please click: http://m.sjzmx.cn Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.
主站蜘蛛池模板:
午夜精品射精入后重之免费观看|
东京热大乱系列无码|
九九热精品在线观看视频|
色欲av无码无在线观看|
色五月五月丁香亚洲综合网|
亚洲中文精品久久久久久不卡|
97成人碰碰久久人人超级碰oo|
野外三级国产在线观看|
日韩乱码人妻无码中文字幕视频|
久久久亚洲欧洲日产国码606|
国产精品无码久久久久久|
国产精品久久久久久久伊一|
少妇被粗大的猛烈进出动视频|
天堂a无码a无线孕交|
国产剧情女孩操大逼视频|
久久精品极品盛宴观看|
欧美黑人性暴力猛交喷水黑人巨大|
精品成人免费自拍视频|
在线观看国产精品一区|
国产日韩av免费无码一区二区三区
|
国产成人综合久久精品尤物
|
国产激情自拍小视频网|
日产精品一区二区免费|
国产肉丝袜在线观看|
国产精品无码2021在线观看|
开心婷婷五月激情综合社区|
国产精品乱码久久久久久小说
|
国产精品无码永久免费不卡|
亚洲精品国产字幕久久麻豆|
国产一区二区三区综合视频|
午夜毛片福利|
免费一看一级毛片|
女人爽到高潮免费看视频|
亚洲国产理论片在线播放|
日本十八禁漫画无遮挡|
日本美人妻OL美脚OL视频网|
亚洲国产黄色|
黄色一区二区三区在线|
人妻丰满熟妇AV无码区APP|
一个人免费观看视频www中文|
欧美.成人.综合在线|

魯公網安備